Start here: which lines are facts
Rather read it? What the video says, in words
A solar proposal taken apart line by line, sorting the figures that are contractual — system size, price, payment schedule — from the ones that are estimates: annual production, the incentives applied, any assumed rise in utility rates, and the degradation and maintenance the model may leave out. Every estimate is a question a homeowner is entitled to ask, and the film shows what an answer worth accepting sounds like.
Facts and assumptions
The four assumptions worth pressing
- 01
Annual production
Ask what shading data it came from. A number from a satellite image and a number from a site survey can differ by a fifth.
- 02
Utility rate escalation
Many proposals assume the utility raises rates every year forever. Ask to see the savings at today's rate instead.
- 03
Incentives applied
Anything income-qualified or block-limited should be marked as unconfirmed until someone has actually checked your eligibility.
- 04
Degradation and maintenance
Panels lose a little output each year and inverters do not last 25. Ask whether either is in the model, and who pays.
Lines that should make you slow down
Red flag
A savings total with no year-by-year table
A single lifetime figure hides every assumption that produced it. Ask for the schedule.
Red flag
“Estimated” on the price but not on the savings
If the savings are estimates too — and they are — the document should say so in the same size type.
